Seudónimo Seudónimo
  • 02-06-2018
  • Mathematics
contestada

It takes 10 workers 24 hours to do a job.
Fill in the chart.

It takes 10 workers 24 hours to do a job Fill in the chart class=

Respuesta :

biggersis1968p8xgn0 biggersis1968p8xgn0
  • 02-06-2018
5 in 48 
10 in 24
20 in16
30 in12
40 in 8
50 in 4
Answer Link

Otras preguntas

What is the volume of a rectangular solid, the width of which is equal to a cm, the length is twice the width and the height is twice the length?
plsss help will give brainliest
Please help ASAP! Answer, yes or no to state whether each data set is likely to be normally distributed. 1). the number of coupons used at a supermarket 2). the
what is the reciprocal of -1
A chemist dissolves 274.mg of pure barium hydroxide in enough water to make up 50.ml of solution. calculate the ph of the solution. (the temperature of the solu
What is the slope of the line shown below? A. 2/3 B. -3/2 C. 3/2 D. -2/3
PLEASE HELP ASAP!!! CORRECT ANSWER ONLY PLEASE!!! I CANNOT RETAKE THIS AND I NEED ALL CORRECT ANSWERS ONLY!!! True or False: Doorbells, scrap yards, and rock co
What letter on the map shows the area on which the Mississippian civilization was located?
Explain how to determine whether two known pairs of points are on the same line.
Consider the two box plots below. Which of the following statements is true? A. The median of box plot A is greater than the median of box plot B. B. Both the b