Six people paint the fence and 15 hours how long would it take five workers to do the same job

Respuesta :

somaiasult2006
somaiasult2006 somaiasult2006
  • 02-01-2019
it will take 12.5 hrs for five workers to do the same job.


steps:

15 × 5 = 75

75 ÷ 6 = 12.5
Answer Link

Otras preguntas

What is the next number of the pattern. 2 7 26 101 400
What led to the diverse populations of New York and New Jersey?
what is 5m+6+m-18=60
simplify as much as possible.Assume that all variables represent positive real number4x√32xv^2 + v√2x^3
Q: What is the indicated term of the arithmetic sequence? someone help!!!! a14 for 200,196,192... A: a. 148 b. 252 c. 144 d. 239
How do I factor 2y^2 - y - 10
The specific temperature at which a substance changes from a liquid to a gas is an example of a
What is the next number of the pattern. 2 7 26 101 400
What do you think was the most serious problem faced by settlers in Virginia? Why?
Solve the equation: 1/4 + w = 6 1/3