dannyd2310
dannyd2310 dannyd2310
  • 02-04-2019
  • Computers and Technology
contestada

Why is the monitoring and controlling phase extremely important to the success of the project

Respuesta :

zdgzr
zdgzr zdgzr
  • 22-01-2020

Answer: It is the only way to ensure that work plan estimates are on track and that early intervention can take place.

Explanation: APEX

Answer Link

Otras preguntas

Which is required for the light-dependent reactions in photosynthesis to occur? H2O ATP NADPH CO2
when did the The Korean War officially began in 1950
What was a significant effect of the Greco-Persian Wars?
addiction to this drug may lead to a user crashing when they don't have drugs to create the next high
A triangle has vertices P(1, 3), Q(3, 5), and R(6, 2). The slope of the median to QR is a. 1/7 b. -1/2 c. 1 Can you lead me through the steps cuz i don't get
Where should a person who wants to work as a teacher aide in a Roman Catholic school begin to look for the job? A. Bishop B. Principal C. Diocesan Office of Ed
What caused the melting of the Moon's surface around 4 billion years ago to form the highlands? Select all that apply. A. tectonic activity B. radioacti
What does this mean Hydrogen Bonding
Graph with a line going through points zero comma two point five and four comma two point five. Select the equation of the line that passes through the point (3
Find the slope of the line that contains the points named. K(c + d, c - d), L(c - d, c + d) a. -1 b. 1 c. 0