To complete a job a crew of 8 people needs 18 days. How long will the same job be finished if the crew will have 9 people?

Respuesta :

rockyrules789 rockyrules789
  • 01-11-2019

Answer:

16

Step-by-step explanation:

.

Answer Link
lajfoaofje lajfoaofje
  • 27-06-2020

Answer:

16

Step-by-step explanation:

Answer Link

Otras preguntas

Competitive pressure belongs to what category of risk factors for drug abuse?
Which type of compound is always on electrolyte when it dissolves in water? A) Ionic B) Covalent C) Molecular D) All of these
As a compositional mode for electronic? media, __________ help people find their way through an unfamiliar system or? subject; they? don't give away the key poi
Which of the following is an example of a combination? A. The number of ways 12 picture frames can be arranged on a shelf. B. The number of ways 3 people
Instructions:Type the correct answer in the box. x y 3 10 ? 20 In the table, the relation (x, y) is not a function if the missing value of x is ?
What resource did Hitler want to capture by attacking the southern Soviet Union
What is the first step to construct a line parallel to passing through an external point M, using only a compass and a straightedge? A.Place the compass needle
Which of these is a way to be sure that products or services are acceptable to customers? A. Quality control B. Reinforcement C. Self-talk D. Socia
Compare the economy in the northern United States, to the economy in the southern states, prior to the Civil War.
find greatest 3 digit number divisible by 8,10,12