matttmoney1221 matttmoney1221
  • 02-06-2016
  • Business
contestada

​Finishing the construction of a home two days after the contract called for completion (no injury occurs) most likely will be considered

Respuesta :

andriansp andriansp
  • 08-06-2016
Finishing the construction for a longer period than the date that already agreed upon would be most likely considered : Breach of Contracts.
Which mean that the constructor basically fail to met his end of the contract agreement, causing the other party has the right to walk out from their contract
Answer Link

Otras preguntas

Solve: 6x+1=2(3x-2)+5​
Individuals are finding it convenient and productive to use wireless devices for which of the following reasons? Select one: a. To make use of time that was for
How did Egypt grow during the new kingdom
Consider the following prediction. Prediction: If cows need to eat protein to build muscle tissue, then an increase in the amount of protein in a cow's diet wil
Monica read 7 1/2 pages of a mystery book in nine minutes. What is your average reading right in pages per minute
An important feature of the U.S. Constitution is its provision for a system of checks and balances. Explain the purpose and structure of the system of checks an
How are colonist attempting to address the injustices by Britain
PLEASE HELP ME ON THIS SHADING!!!!!
Cash Paid for Merchandise Purchases The cost of merchandise sold for Kohl’s Corporation for a recent year was $12,265 million. The balance sheet showed the foll
Induced hypothermia is a clinically controlled method to reduce the metabolic rate and, thus, body temperature during surgery. What can one do naturally in orde