brimccauley6658 brimccauley6658
  • 03-08-2022
  • Business
contestada

In a project network, the critical path is the sequence of activities which has the:________.

Respuesta :

66hello60
66hello60 66hello60
  • 03-08-2022

Answer:

The correct answer is the longest time

Answer Link

Otras preguntas

What point appears to be the solution to the system of equations shown in the graph?
I NEED THIS ASAP I GIVE BRAINLIEST!!!!!!! During a scuba dive, Lainey descended to a point 14 feet below the ocean surface. She continued her descent at a rate
In the first step in the life cycle of a star, it is called a:
What role did Hamilton Holmes and Charlayne Hunter play in Georgia’s civil rights movement? They led the struggle for voting rights in Georgia. They were member
Overseers often used older slaves and native-born slaves to handle the seasoning of newly sold slaves. What did process involve?A. Getting the slaves used to th
A dog of mass 20 kg that is running east with a speed of 16 m/s?
Find the total surface area of this triangular prism. 21 cm 29 cm 22 cm 20 cm
Which phrase describes the energy of collision?(1 point) A. heat that causes ice to melt when hot water is poured on it B. force of molecules striking one anoth
Which analogy is correct People are to teeth as cats are to scratching posts. Bird is to nest as bear is to cave. Square is to circle as trapezoid is to octagon
write the pair of fractions as a pair of fractions with common denominators 2/12 and 4/6